Week 8 Boss Fight · Incident #RELEASE-08
Unknown incident during release rehearsal
During a timed fresh-machine rehearsal, the main flow fails after configuration and startup. The failing layer is intentionally undisclosed. Use the frozen inventory and evidence protocol; do not edit source or delete volumes.
AVAILABLE TO READ · LOCKED FOR PASS
Scenario and known facts are readable. Assistance and attempts unlock after the previous Week Gate passes.
KNOWN FACTS
- • The same release artifact passed on another machine
- • All required containers appear in compose ps
- • The failure started after configuration was copied to the fresh machine
Attempt form is locked for progression integrity.